E INDIAN TRL ROW Large Area Block Permit issued for AT&T fiber upgrade
AT&T Southeast is planning an upgrade to the fiber optic network along E Indian Trail between Tarragon Road, Jeanine Drive, Wannsee Drive, and Preston Highway. The work, scheduled from March 5 to July 5, 2026, will involve driving-lane closures for aerial cable installation, very short temporary road closures (cable crossings halted no more than five minutes), and verge work that includes two 2'x4' bore pits and a 740-foot bore, with restoration per Metro Louisville guidelines. Project manager Al Gruse (502-718-3264) and designer Paul Rosenberger (paul.rosenberger@rtsassociates.net) are listed as contacts for questions.