A dirt cut is planned at 2306 Evergreen Rd
A dirt cut is coming to 2306 Evergreen Rd, and the city signed off on the work.
Louisville Gas and Electric has a lane closure planned there, with a 3-foot-by-5-foot cut and excavation on deck. Itβs set to run from November 23, 2026, through December 15, 2026, so that stretch may be a little less breezy than usual.
Louisville Gas and Electric has a lane closure planned there, with a 3-foot-by-5-foot cut and excavation on deck. Itβs set to run from November 23, 2026, through December 15, 2026, so that stretch may be a little less breezy than usual.
Source: Accela Public Works