Sidewalk work is set for 447 S 8th St in Louisville
Give 447 S 8TH ST a little room. Road work there is set for 11/11/2026 through 11/25/2026, with a sidewalk closure, excavation, and a TARC shelter in the mix.
The city signed off on it on 11/06/2026. Concrete work is the plan, and thatβs the kind of corner where youβll want to watch your step.
The city signed off on it on 11/06/2026. Concrete work is the plan, and thatβs the kind of corner where youβll want to watch your step.
Source: Accela Public Works