Three dirt cuts are planned at 5915 Outer Loop
A stretch of excavation is in the works at 5915 Outer Loop, with three dirt cuts planned between 5637 Outer Loop and 5915 Outer Loop.
Itβs set to run from November 2, 2026, through December 4, 2026, and the city says no lane, sidewalk, or road closure is planned.
So if you use that stretch a lot, keep an eye out.
Itβs set to run from November 2, 2026, through December 4, 2026, and the city says no lane, sidewalk, or road closure is planned.
So if you use that stretch a lot, keep an eye out.
The city has not published a date for when this began.
Source: Accela Public Works