Road work is starting at 600 W Broadway
Give 600 W Broadway a miss around November 9. A trench is in the works there, with a 42-foot by 2-foot open cut planned from 600 W Broadway to 548 W Broadway, plus lane and sidewalk closures.
The work is set to run through November 30, and theyβre planning an asphalt cut in the street. So if you were hoping for a quiet block, well, Broadway has other ideas.
The work is set to run through November 30, and theyβre planning an asphalt cut in the street. So if you were hoping for a quiet block, well, Broadway has other ideas.
The city has not published a date for when this began.
Source: Accela Public Works