A 300-foot dirt cut is coming to 2517 Terra Crossing Blvd
Road work is coming to 2517 Terra Crossing Blvd in Louisville, with a dirt cut stretching about 300 feet by 5 feet.
The city signed off on it, and the plan calls for one lane closed while excavation runs from November 3, 2026, through December 29, 2026.
The city signed off on it, and the plan calls for one lane closed while excavation runs from November 3, 2026, through December 29, 2026.
Source: Accela Public Works