Work is planned in the street at 1801 Rudy Ln
A 2-by-2 street cut is in the works at 1801 Rudy Ln, and Flock Safety is the name on it.
The plan calls for dirt work there from October 30 through December 4, 2026. No lane closure, road closure, or sidewalk closure is planned.
The plan calls for dirt work there from October 30 through December 4, 2026. No lane closure, road closure, or sidewalk closure is planned.
The city has not published a date for when this began.
Source: Accela Public Works