LG&E plans two sidewalk cuts at 727 W Chestnut St
Sidewalk cuts are in the works at 727 W Chestnut St, where Louisville Gas & Electric is planning two 3-by-5 cuts.
That one comes with lane and sidewalk closures, plus excavation, from October 21 through November 30, 2026.
That one comes with lane and sidewalk closures, plus excavation, from October 21 through November 30, 2026.
The city has not published a date for when this began.
Source: Accela Public Works