A lane closure and dirt cut are planned at 5205 Charmane Dr
A dirt cut is coming to 5205 Charmane Dr in Louisville, and itβs a small one, just 3 feet by 5 feet.
The work is set to run from October 23, 2026 through November 20, 2026, with a lane closure and excavation on the books. Sounds like Charmane Dr is getting a little trench-and-go action.
The work is set to run from October 23, 2026 through November 20, 2026, with a lane closure and excavation on the books. Sounds like Charmane Dr is getting a little trench-and-go action.
Source: Accela Public Works