A dirt cut is planned at 11812 Ellingsworth Ln
Give Ellingsworth Ln a heads-up. At 11812 ELLINGSWORTH LN, the city signed off on a dirt cut, one 3-foot by 5-foot excavation with a lane closure.
Work is set for October 6 through November 3, 2026. Louisville Gas & Electric is the name on it, so expect a little street hassle while they dig.
Work is set for October 6 through November 3, 2026. Louisville Gas & Electric is the name on it, so expect a little street hassle while they dig.
Source: Accela Public Works