Sidewalk work is coming to 706 E Broadway
A sidewalk cut is coming to 706 E Broadway, and the city signed off on it.
The work is set for concrete pavement with two cuts, about 25 feet total, and it includes a utility cut and excavation.
Itβs slated to run from October 2, 2026 through December 1, 2026, so that stretch may be a little less friendly to foot traffic for a while.
The work is set for concrete pavement with two cuts, about 25 feet total, and it includes a utility cut and excavation.
Itβs slated to run from October 2, 2026 through December 1, 2026, so that stretch may be a little less friendly to foot traffic for a while.
Source: Accela Public Works