A dirt cut and lane closure are set for 5207 Rookwood Ave
Give Rookwood Ave a heads-up. At 5207 Rookwood Ave, LG&E has the green light for a 3-foot by 5-foot dirt cut, with lane closure and excavation on the way.
Work is set for October 8 through November 5, 2026. So if youβre passing by, expect that stretch to get a little less polite for a spell.
Work is set for October 8 through November 5, 2026. So if youβre passing by, expect that stretch to get a little less polite for a spell.
Source: Accela Public Works