A dirt cut with a lane closure is planned at 5508 Felker Way
Give 5508 Felker Way a little space starting October 7. Louisville Gas and Electric has a dirt cut planned there, and it comes with a lane closure and excavation.
Itβs a single cut, about 3 feet by 5 feet. The work is set to run through November 4.
Itβs a single cut, about 3 feet by 5 feet. The work is set to run through November 4.
Source: Accela Public Works