A road cut is planned at 603 E Breckinridge St
Give E Breckinridge St a little grace starting October 4. Louisville Water Company has road work in the works at 603 E Breckinridge St, with a street cut running from 603 to 645 and a road closure marked yes.
Itβs set to run through October 31. The block is looking at excavation too, so this one should make the street a little less cooperative for a while.
Itβs set to run through October 31. The block is looking at excavation too, so this one should make the street a little less cooperative for a while.
The city has not published a date for when this began.
Source: Accela Public Works