Lane closure work is coming to 1416 Selinda Ave
Give Selinda Ave a heads-up. AT&T Southeast has the green light for road work at 1416 Selinda Ave, with a lane closure planned from October 2, 2026 through November 2, 2026.
Itโs a five-day job on asphalt, and thereโs no road closure or sidewalk closure in the mix. So if youโre rolling through that block, expect things to get a little tighter.
Itโs a five-day job on asphalt, and thereโs no road closure or sidewalk closure in the mix. So if youโre rolling through that block, expect things to get a little tighter.
Source: Accela Public Works