A sidewalk cut is coming to 631 S 5TH ST
Give 631 S 5TH ST a look, because Louisville Gas & Electric Company is set for a sidewalk cut there. Itβs a 3-foot by 5-foot cut, with lane closure and sidewalk closure in the mix.
The city signed off on it, and the work is slated for September 22 through October 31, 2026. Thatβs the kind of street-side fuss that makes a block pay attention.
The city signed off on it, and the work is slated for September 22 through October 31, 2026. Thatβs the kind of street-side fuss that makes a block pay attention.
Source: Accela Public Works