LG&E work is planned for 7600 Columbine Dr
Give Columbine Dr a heads-up. Louisville Gas & Electric got the city’s go-ahead for a 3-foot by 5-foot dirt cut at 7600 Columbine Dr.
It’s slated to run with one lane closed and excavation work on the way. The city signed off on it, so this one’s official.
It’s slated to run with one lane closed and excavation work on the way. The city signed off on it, so this one’s official.
Source: Accela Public Works