Lane closures and digging are coming to 7434 Virginia Ave
Lane Closure work is coming to 7434 Virginia Ave in Louisville, and the city signed off on it.
Louisville Gas and Electric plans a 3-foot by 5-foot dirt cut there, with excavation and a lane closure in the mix.
The work is slated to run from March 1, 2027 through March 1, 2028.
Louisville Gas and Electric plans a 3-foot by 5-foot dirt cut there, with excavation and a lane closure in the mix.
The work is slated to run from March 1, 2027 through March 1, 2028.
Source: Accela Public Works