LG&E is digging a dirt cut at 13008 Bessels Blvd
Give Bessels Blvd a heads-up. At 13008 Bessels Blvd, Louisville Gas and Electric has a dirt cut coming with a lane closure, a 3-foot by 5-foot cut, and excavation on the books.
The city signed off, so this oneβs official. Work is set for September 23, 2026 through October 21, 2026.
The city signed off, so this oneβs official. Work is set for September 23, 2026 through October 21, 2026.
Source: Accela Public Works