LG&E is cutting a dirt patch at 9902 Vega Ln
A dirt cut is coming to 9902 Vega Ln, and the city signed off on it.
It’s a single 3-by-5 foot cut with excavation and a lane closure, set to run from September 23 through October 21, 2026. That’s the kind of road work that makes everybody on the block keep one eye on the curb.
It’s a single 3-by-5 foot cut with excavation and a lane closure, set to run from September 23 through October 21, 2026. That’s the kind of road work that makes everybody on the block keep one eye on the curb.
Source: Accela Public Works