Work in the street is planned at 335 W Broadway
A bus setup is in the works at 335 W Broadway, right by The Brown Hotel.
The cityโs got an encroachment request moving through for that spot, with work listed for September 25 through October 1, 2026. No street closure or sidewalk closure is shown, so this one looks more like a careful squeeze than a full shutdown.
The cityโs got an encroachment request moving through for that spot, with work listed for September 25 through October 1, 2026. No street closure or sidewalk closure is shown, so this one looks more like a careful squeeze than a full shutdown.
Source: Accela Public Works