Road work is set for 710 E Jefferson St
Give 710 E Jefferson Street a little room September 23 through 26. The city signed off on street work there, with two no-parking signs planned and temp parking on a bagged meter.
Itβs tied to Tempo by Hilton Louisville NuLu, and the work is set to stay off the sidewalk, the lane, and the road itself.
Itβs tied to Tempo by Hilton Louisville NuLu, and the work is set to stay off the sidewalk, the lane, and the road itself.
Source: Accela Public Works