A lane closure and dirt cut are planned at 4512 Cod Dr
Give 4512 Cod Dr a heads-up. A 3-by-5 dirt cut is coming, with a lane closure and excavation in the mix.
Louisville Gas and Electric has that one lined up for Sept. 18 through Oct. 16, 2026, and the city has signed off. If youβre passing through there, this is the kind of street work that likes to make itself known.
Louisville Gas and Electric has that one lined up for Sept. 18 through Oct. 16, 2026, and the city has signed off. If youβre passing through there, this is the kind of street work that likes to make itself known.
Source: Accela Public Works