2627 CRUMS LN road work permit approved for fiber optic installation
Vero Networks filed a road work permit to install about 2,066 feet of fiber optic cable near 2627 Crums Ln to bring service to Henry B. Schaffner Elementary School at 2701 Crums Ln. The project, between Burrell Dr and Fern Lea Rd, includes a curb lane closure with flaggers, a sidewalk closure, two handholes, seven potholes and four bore pits; restoration will be completed per KYTC plans. The record notes the permit, restoration and notification plans were attached and the case was closed on 10/04/2026.
Source: Accela Public Works