1846 SHERWOOD AVE encroachment permit for lead replacement project
Louisville Water Company is doing a lead service replacement at 1846 Sherwood Ave and has an encroachment permit for lane and sidewalk closures between Fernwood Ave and Bardstown Rd. The job runs 06/21/2026–07/18/2026, includes one 4' x 5' pavement cut in the eastbound lane, and the road will be plated and reopened to traffic at the end of work shifts with restoration per LMPW utility policy; resident notification letters went out on 06/12/2026. Project manager Joseph Sloan and contractor Southern Pipeline Construction Co. Inc. are listed, and the property owner is Matthew Hendrix.
Source: Accela Public Works