Want scoops like this for your street? πŸ‘€
You're browsing a scoop in 40118. Add your address and Nelly will email you everything happening within 1 mile of it. It's free.
Get free alerts
Odds & ends

515 Tin Dor Way issued continuation encroachment permit for Callie Dr water main

Louisville Water Company (applicant Kelli Starnes) is continuing a Callie Drive project to install a new water main, including one pavement cut 4' x 575' starting at 515 Tin Dor Way and running toward Kirsch Way. The road between Tin Dor Way and Kirsch Way may be closed during work shifts but will be plated and reopened at the end of each shift, with restoration done per LMPW utility policy and residents already notified. Owner Wilcox Joel Kelly is listed; the job is managed by Jacob Clark, contracted to Basham Construction, inspected by Kevin Sturgeon, and scheduled for May 31–June 13, 2026.
Scoop date
May 31, 2026
Location
515 TIN DOR WAY
Louisville, KY 40118

Source: Accela Public Works

Curious who's involved? πŸ‘€

Sign in to see the people connected to this scoop.

Sign in to unlock ✨