👀 Get notified on activity near you

Within a 1-mile radius of your address, see everything that's happening.

Other

1430 Christy Ave Continuation Permit for Lead Replacement Project

Louisville Water Company is doing a lead replacement at 1430 Christy Ave for owner Steven A. Roosa under a continuation permit. Expect one 4' x 5' pavement cut on the east side (between Edward St. and Rubel Ave), lane and sidewalk closures with the road plated and reopened at the end of shifts, restoration per LMPW policy, work scheduled May 13–30, 2026; project manager Joseph Sloan and contractor Basham Construction are listed as contacts and residents were notified on 5/12/2026.
Scoop Date
May 12, 2026
Property Address
1430 CHRISTY AVE
Louisville, KY 40204

People

BASHAM CONSTRUCTION
Contractor
Louisville Water Company
Applicant
Louisville Water Company
Applicant Organization
Joseph Sloan
Project Manager
Terry Likens
Contractor
STEVEN ROOSA
Owner

Curious who's involved? 👀

Sign in to see the people connected to this scoop!

Sign In to Unlock ✨