200 High Rise Dr: LGE gas work with westbound curb lane closure and 3x5 dirt cut
Louisville Gas & Electric Company (applicant Zachary Mark Lambertus) will close the westbound curb lane on High Rise Drive to perform a single 3' x 5' dirt cut at 200 High Rise Dr. to repair a gas leak. Work is scheduled May 8βJune 5, 2026; expect a short curb-lane closure rather than a full road shutdown, and the cut will be restored under LMPW's utility restoration policy β the property is owned by BT Property LLC and project engineer James George is listed as the technical contact.
Source: Accela Public Works