5113 Ferrer Way applied for curb lane closure for gas leak repair dirt cut
Louisville Gas and Electric will close the northbound curb lane on Ferrer Way between Waltlee Road and Michael Edward Drive to repair a gas leak at 5113 Ferrer Way. The crews will perform one 3' x 5' dirt cut (an excavation) — work is permitted between January 26 and February 23, 2026, with the actual repair expected to take about four days. Cuts will be restored under the LMPW utility restoration policy, and the property owner is Taylor Matthew Stuart; LGE contacts are listed if neighbors need more details.