👀 Get notified on activity near you
Within a 1-mile radius of your address, see everything that's happening.
Other
3926 Illinois Ave road closure for drainage pipe replacement
The Metropolitan Sewer District (MSD) is planning a road closure in front of 3926 Illinois Ave to excavate and replace a failed drainage pipe that’s currently under the pavement. Owner Merrick Patrick is listed for the property, and MSD — project manager Joe Exely (502-438-0542, joseph.exely@louisvillemsd.org) with contractor Chris Pile — has filed traffic control and restoration plans; the work is set between Russell Ave and Grenade Ave from 11/12/2025 to 11/24/2025.
Scoop Date
November 12, 2025
Property Address
3926 ILLINOIS AVE
Louisville, KY 40213