2627 Dixdale Ave encroachment permit for gas leak repair and curb lane closure
Louisville Gas and Electric is planning a small excavation to repair a gas leak at 2627 Dixdale Ave, proposing a single 3' x 5' dirt cut on Dixdale between S 28th Street and Olive Street. Theyβve applied to close the eastbound curb lane, list a work window from 11/14/2025 to 12/12/2025 with about four days of actual work expected, and note that cuts will be restored under the LMPW utility restoration policy. Owner is Heath Shy, and LGE contacts on the project are Project Engineer Lori Boisvert and applicant Kaitlyn Downs for questions.