1733 Bardstown Rd Sidewalk closure for 60ft boom lift at Deerpark Baptist Church
Deer Park Baptist Church is planning window restoration on the second floor along the Bardstown Road side of their building at 1733 Bardstown Rd, using a 60-foot boom lift. The church will close the sidewalk between Maryland Ave and the west parking-lot entrance for about three to four days (work slated for October 27–31, 2025), with work hours roughly 8 a.m.–2 p.m. each day; pedestrians will be detoured around the building via the rear alley back to Bardstown Road.