4925 HELLER ST encroachment permit for Verizon fiber optic installation
Verizon, represented by Power of Design on behalf of LTS Managed Technical Services, plans to pull about 1,607 feet of fiber optic cable through existing conduit along Heller St to service the handhole in front of the tower at 4906 Heller St, with the work listed at 4925 Heller St; the permit notes no street cuts or restoration plan, but a verge closure and lane impacts are expected. The property is owned by Heller VII Partnership LP, the job is scheduled between November 2 and December 28, 2025, and project contacts include construction superintendent Rodney Horning and DrillTekβs Josh Heberle.