1224 S 15TH ST LGE gas work; curb lane closed for 3' x 5' asphalt cut
Louisville Gas and Electric (applicant Kaitlyn Downs) will be repairing a gas leak at 1224 S 15TH ST, which requires a single 3' x 5' asphalt cut and a temporary closure of the southbound curb lane on S 15th between Dumesnil St and W Oak St. The work, which involves excavation, is scheduled from 10/22/2025 to 11/19/2025 and the cut will be restored under the LMPW utility restoration policy. The property is owned by TP Property Management LLC, and project engineer James George is listed as the contact for the job.