A soil layout change is planned near 1675 Bowhall Dr in Durham
Ovation at Sweetbrier Ph 2&3 is looking for a tweak near 1675 Bowhall Dr in Durham.
The ask is to revise where the structural soil goes. Itโs still in the works, and itโs marked corrections required for now.
The ask is to revise where the structural soil goes. Itโs still in the works, and itโs marked corrections required for now.
The map marks the project area supplied by the city. It does not identify a specific building.
Reported status: Corrections Required