New MSD pump station power and controls are going in at 6909 Beech Ave
A new MSD pump station power and controls setup is coming to 6909 Beech Ave in Louisville. The city signed off on the electrical work, which is a rewire job running somewhere around $79,950.
Advanced Electrical Systems is the contractor on it, and the plan calls for 100 amps with an overhead connection.
Advanced Electrical Systems is the contractor on it, and the plan calls for 100 amps with an overhead connection.
Source: Accela Building