Overhead power is going underground at 423 Bermuda Way
A new underground electrical setup is coming to 423 Bermuda Way. The city signed off on the work for City Of Middletown Salt Dome 2, and itβs a rewire job at about $5,000.
Wagner Electric is on it, with the overhead service being swapped to underground. The rough-in check is lined up for November 4, 2026.
Wagner Electric is on it, with the overhead service being swapped to underground. The rough-in check is lined up for November 4, 2026.
Source: Accela Building