Blo Dry Bar is getting new electrical work at 10538 Fischer Park Dr
A Blo Dry Bar remodel is coming to 10538 Fischer Park Dr. The work there is a fresh rewire, with the old electrical coming out, new wiring going in, plus new devices and lighting.
The city signed off on it, and the tab is about $15,000. So if you were wondering whatβs happening on that corner, thatβs the story.
The city signed off on it, and the tab is about $15,000. So if you were wondering whatβs happening on that corner, thatβs the story.
Source: Accela Building