New HVAC electrical work is going in at 2509 Portland Ave
A new HVAC electrical setup is on the way at 2509 Portland Ave, inside the gymnasium at Dream Center Academy Christian School.
The city signed off on a new main breaker panel and service for that unit, with the job pegged at somewhere around $10,000.
So if youβve got a student there, or just a soft spot for old buildings getting a little smarter, thatβs the sort of upgrade that keeps the lights and the air moving.
The city signed off on a new main breaker panel and service for that unit, with the job pegged at somewhere around $10,000.
So if youβve got a student there, or just a soft spot for old buildings getting a little smarter, thatβs the sort of upgrade that keeps the lights and the air moving.
Source: Accela Building