New wiring is going in at 4600 Shelbyville Rd Suite 632
TJ at 4600 Shelbyville Rd Suite 632 is getting rewired.
That means 6 booths with two plugs apiece, each with its own switch and light, plus 3 lights in the lobby on one switch. The city signed off on the work on September 10, 2026.
That means 6 booths with two plugs apiece, each with its own switch and light, plus 3 lights in the lobby on one switch. The city signed off on the work on September 10, 2026.
Source: Accela Building