2210 WOODLAND AVE electrical permit issued
IDA Development Group replaced the 200-amp, three-phase service equipment — swapping the service disconnect, meter, indoor panel and grounding — to restore power at 2210 Woodland Ave after service had been off for more than a year. The issued electrical rewire permit notes two meters, an overhead connection, and a modest $75 permit fee.