Asbestos removal is planned at 4500 Camp Ground Rd
Some renovation work is in the works at 4500 Camp Ground Rd in Louisville, and it comes with asbestos removal, too.
American Synthetic Rubber Co LLC is planning to remove 460 square feet of transite panels from the outside of the building, with work slated for November 21 to 22, 2026. The cityβs still partway through it, so this one is not fully signed off yet.
American Synthetic Rubber Co LLC is planning to remove 460 square feet of transite panels from the outside of the building, with work slated for November 21 to 22, 2026. The cityβs still partway through it, so this one is not fully signed off yet.
Source: Accela APCD