Interior work is planned at 4808 Chin Page Rd
Something new is getting carved out at 4808 Chin Page Rd in Durham. A laundry facility is planned inside the existing single-tenant building, with the work pegged at somewhere around $74,000.
The city’s signed off on it, so this one’s officially in motion. There’s also a note to have a 3-hour rated wall on site for inspection, which is the kind of detail that makes a simple interior job sound a lot less simple.
The city’s signed off on it, so this one’s officially in motion. There’s also a note to have a 3-hour rated wall on site for inspection, which is the kind of detail that makes a simple interior job sound a lot less simple.
This location represents a parcel of land, not an exact building or entrance.
Reported status: Issued