Road work is coming to 635 W Main St in Louisville
Give 635 W Main Street a little room on October 16, 2026. A lane-side setup is in the works there, with 20 no-parking signs and no sidewalk, road, or curb cut closures planned. It...
What's opening, what's being built and what the neighbors are talking about at addresses in 40202.
2,221 scoops so far.
Give 635 W Main Street a little room on October 16, 2026. A lane-side setup is in the works there, with 20 no-parking signs and no sidewalk, road, or curb cut closures planned. It...
A new fire detection system is in the works at 601 W Broadway, and itβs for a renovation area on the 5th floor of Gene Snyder. The setup calls for smoke detectors, horns, and vi...
Give W Main Street a heads-up. Something is in the works at 727 W Main St near the W Washington St side, with a sidewalk closure and a road closure planned. The work is slated to...
Give 635 W Market St a little room starting October 11. Some road work is in the works there, and itβs supposed to run through October 12. The cityβs got it listed as an encroachm...
Give 102 W Main Street a little room October 16 and 17. White Lodging has road work in the works there, with asphalt on deck. Itβs a short one, and theyβre not planning a lane clo...
Give 101 W Main Street a heads-up, because road work is in the works right at 101 W Main Street in Louisville. Itβs for an encroachment, with asphalt work planned for October 9 to...
Give 514 W Liberty St a heads-up. Some road work is in the works there for October 19 through October 23, and it calls for both a lane closure and a sidewalk closure. Itβs still j...
A dumpster is in the works at 222 E Witherspoon St in Louisville. Quantum Enterprises Inc wants it there from October 1 through October 8, 2026. The city hasnβt signed off yet, so...
A lane, sidewalk, and road closure are in the works at 700 E Main St 204. Star Drywall of Louisville, Inc. wants the job to run October 21 through October 27, 2026. Itβs all tied...
Some street work is in the works at 209 S 5TH ST. A crew is planning asphalt work there, with temporary parking on bagged meters, from October 5 through November 30, 2026. No la...
A tower at 319 Abraham Flexner Way is in the middle of asbestos cleanup, and the hallway is the spot. During replacement of damaged VCT in a common hallway, PACM mastic turned u...
Give 201 E Market St a heads-up. Sidewalk work is in the works there, with a lane closure and a sidewalk closure on the books. Ventora Construction Group is the one listed for the...
Give 620 E Market St 101 a little room starting October 2. Some road work is in the works there through October 13, with 10 no-parking signs planned and no road, sidewalk, or la...
Road work is in the works at 607 W Main St in Louisville. The plan calls for asphalt work with both the sidewalk and the road closed from October 19, 2026 through October 23, 20...
Give 340 W Chestnut Street a little room October 2 through October 9. Somebodyβs got road work in the works there, with temp parking on a bagged meter set to be part of the setup....
Give E Gray Street a heads-up. At 129 E Gray St, a road project is in the works with 16 asphalt cores cut between 210 E Gray St and 649 S 1st St, and the city says the road will cl...
Lane and sidewalk work is in the works at 601 W Jefferson St. ATT Southeast has its name on the job, and the dates listed run from September 22, 2026 through December 31, 2026. Th...
Some road work is in the works at 710 E Jefferson St. Tempo by Hilton Louisville NuLu has plans for a one-day street setup on October 1 and 2, with one no-parking sign and temp par...
Heads-up at 320 W Jefferson St. Temporary parking on a bagged meter is in the works there, with work set for September 24 through October 1. No street cut, no road closure, and no...
Give 700 E Main Street 104 a miss around September 28. Some road work is in the works there, with lane, sidewalk, and road closure all on the table. Star Drywall of Louisville is...
A little road work is in the works at Tempo by Hilton Louisville NuLu, 710 E Jefferson St. The hotel wants to use the street out front from October 1 through October 3 for temp pa...
A dumpster is in the works at 124 S 1st St in Louisville, and itβs set to sit there from September 18, 2026 through October 15, 2026. Kentucky Spirit Bottling Co is the name on it...
A curb cut is in the works at 222 E Witherspoon St in Louisville. Itβs set up as an asphalt job, with the work window running from September 25, 2026 to October 9, 2026. No road c...
Two mini splits are on the way to 201 E Main St in Louisville, and the city has signed off on the HVAC work. Wilkinson Builders is listed on the job, with Prudential HVAC handli...
101 W Market is getting a tenant build-out for future apartment space. Itβs planned for the 2nd through 4th floors at 101 W Market St, and the job is listed at about $5,000. The c...
Heads-up on 429 W Muhammad Ali Blvd. Trinity Steel Services LLC has a road closure in the works there, with a start date of September 26 and a wrap date of October 3. Itβs set for...
Angels Lemonade is coming to 709 E Market St for Nulu Festival, with a pink little stand set up to sell fresh squeezed lemonade. Itβs planned as a stationary setup, with the dat...
Something tobacco-related is in the works at 305 W Broadway. Elliment Restaurant LLC, billed as a Jamaican restaurant lounge convenience store, has a tobacco shop setup under the n...
Give 121 S Floyd St a look next week. Hutchins Telecom Solutions has road work in the works there, with a lane closure and sidewalk closure planned from September 14 through Octobe...
A road cut is in the works at 319 E Market St, and this oneβs got a full road closure attached. Hutchins Telecom Solutions wants to dig in the alley from 121 S Floyd St to 324 E M...
Give 710 E Jefferson St a little room this month. Tempo by Hilton Louisville NuLu wants to do some work in the street there, with one no-parking sign planned for September 16 throu...
Give 710 E Jefferson St a look around September 17. Tempo by Hilton Louisville NuLu is planning some street work there, and the city says 2 no-parking signs would go up for it....
Give 315 W Broadway a heads-up. Some road work is in the works there for September 15, 2026, and the plan calls for temp parking on a bagged meter. The cityβs still working throug...
A new 200-amp setup is going in at 649 S 1st St, in the parking lot for Whittenburg Construction Trailers. The city signed off on a temporary pole, meter, and panel there, and itβ...
Give East Washington Street a little room starting September 11. Louisville Gas & Electric Company has lane closure work planned at 200 E Washington St, and itβs set to run through...
Two No Parking signs and a bagged meter will pop up at 710 E Jefferson St for brief work on Sept. 11β12, 2026. An encroachment permit has been submitted by Tempo by Hilton Louisv...
Heads up, expect the lane and the sidewalk to be closed at 580 S Preston St from September 14β18, 2026, and a meter will be bagged for temporary parking. Kentuckiana Electrical S...
Give 121 S Floyd St a look next month. A 42-foot street cut is in the works there, with lane, sidewalk, and road closures all part of the plan. It runs from 245 E Market St on the...
Road work is scheduled at 632 South 3rd Street for September 6β12, 2026, and an encroachment permit has been submitted. The permit flags temporary parking on bagged meters by the...
Heads up: Hilton Garden Inn at 350 W Chestnut St has submitted an encroachment permit to bag a parking meter and allow temporary on-street parking from September 21 to 24, 2026....